Thought we could all share what our current project list is. Guys, what's your expected return for the wife? Wives, what's the list for your man?
After all I've done for and on the bike, I've let other stuff go. It's tough to "want" to do projects when you really want to be out riding! Now that my kids are almost all gone, one in two weeks and the other in a year, we are turning the house into something the two of us alone want to live in. When we got the place 9 years ago, we ordered on the cheap having three young teenagers who we KNEW would destroy the place. Well, they didn't let us down! So, we're now replacing the old with quality new stuff, trying to make each part of the remodel count in case we ever decide to sell and move.
Completed projects:
Dining room complete
Garage Complete (Except organization, see below)
New driveway complete (Need a LARGE snowblower now!!)
95% composite deck complete (Expensive but I won't be staining, painting, sanding or replacing anything in MY lifetime! )
Current "Honey-Do" List:
Living room remodel - In progress
Hardwood flooring - Waiting for carpet removal (See LR Remodel above)
Front Foyer - Tiling - Materials on hand but need to rip out a short wall (See LR Remodel above)
1st floor Bathroom - marble and new toilet is in! Need to refinish tub and shower and install new fancy medicine cabinet.
Kitchen - materials on hand for tiling, need to order new cabinets to install in the "eat-in" corner. After all is done, have new counter top and sink installed.
Basement Dry good pantry - Partial materials on hand
Outdoor patio/kitchen - Large fricken' hole dug, need gravel dumped and compacted then concrete work completed.
Mailbox replacement - onhand, replacing tonight
Sprinkler system install - first above ground wet run unsuccessful. Need to subdivide into 4 separate zones. More parts on Wednesday.
Garage organization - two year old garage and still have not installed the workbench or all the Gladiator wall racks yet. Now I have a new 1300 lb hoist to install.
Bike Trailer - Got the Haulmaster wheel chocks, just need a trailer!
Driveway seal coat - bought all the stuff this weekend but need a couple guaranteed good days to seal. Need to park the bikes at the neighbor's place for that time.
Stairway - remove carpet and install Oak treads to second floor, tile risers, oak flooring at top landing.
Outdoor stairs - remove crap set and build larger landing with stairs (All composite to match the deck) going down to left AND right (to patio)
Relocate HWBB heater - See next item.
Door to deck - New living room (used to be son's bedroom) needs a door to deck.
(Forgot one!) MBR Closets - framed and rocked, need to put oak fascia and trim on and build out drawers and entertainment/TV shelves in the center
And two more!
I need to expand the new garage by adding a 10'x24' addition on the side facing the woods to move all the lawn, garden and deck furniture into which will also be the winter home for the motorcycles. (Tight squeeze in the garage for the winter as it stands)
Build out the other half of the basement to create a hallway to the guest room, a new laundry room and enclose the utilities in their own unfinished space.
Now, I've got to find some time to ride too.
BTW, FREE BEER to anyone coming by to help! :thumbup:
After all I've done for and on the bike, I've let other stuff go. It's tough to "want" to do projects when you really want to be out riding! Now that my kids are almost all gone, one in two weeks and the other in a year, we are turning the house into something the two of us alone want to live in. When we got the place 9 years ago, we ordered on the cheap having three young teenagers who we KNEW would destroy the place. Well, they didn't let us down! So, we're now replacing the old with quality new stuff, trying to make each part of the remodel count in case we ever decide to sell and move.
Completed projects:
Dining room complete
Garage Complete (Except organization, see below)
New driveway complete (Need a LARGE snowblower now!!)
95% composite deck complete (Expensive but I won't be staining, painting, sanding or replacing anything in MY lifetime! )
Current "Honey-Do" List:
Living room remodel - In progress
Hardwood flooring - Waiting for carpet removal (See LR Remodel above)
Front Foyer - Tiling - Materials on hand but need to rip out a short wall (See LR Remodel above)
1st floor Bathroom - marble and new toilet is in! Need to refinish tub and shower and install new fancy medicine cabinet.
Kitchen - materials on hand for tiling, need to order new cabinets to install in the "eat-in" corner. After all is done, have new counter top and sink installed.
Basement Dry good pantry - Partial materials on hand
Outdoor patio/kitchen - Large fricken' hole dug, need gravel dumped and compacted then concrete work completed.
Mailbox replacement - onhand, replacing tonight
Sprinkler system install - first above ground wet run unsuccessful. Need to subdivide into 4 separate zones. More parts on Wednesday.
Garage organization - two year old garage and still have not installed the workbench or all the Gladiator wall racks yet. Now I have a new 1300 lb hoist to install.
Bike Trailer - Got the Haulmaster wheel chocks, just need a trailer!
Driveway seal coat - bought all the stuff this weekend but need a couple guaranteed good days to seal. Need to park the bikes at the neighbor's place for that time.
Stairway - remove carpet and install Oak treads to second floor, tile risers, oak flooring at top landing.
Outdoor stairs - remove crap set and build larger landing with stairs (All composite to match the deck) going down to left AND right (to patio)
Relocate HWBB heater - See next item.
Door to deck - New living room (used to be son's bedroom) needs a door to deck.
(Forgot one!) MBR Closets - framed and rocked, need to put oak fascia and trim on and build out drawers and entertainment/TV shelves in the center
And two more!
I need to expand the new garage by adding a 10'x24' addition on the side facing the woods to move all the lawn, garden and deck furniture into which will also be the winter home for the motorcycles. (Tight squeeze in the garage for the winter as it stands)
Build out the other half of the basement to create a hallway to the guest room, a new laundry room and enclose the utilities in their own unfinished space.
Now, I've got to find some time to ride too.
BTW, FREE BEER to anyone coming by to help! :thumbup:
Last edited: