I'm making progress guys, but you must all realize that welding these things is VERY tricky. If I get too much heat on the splined part, It'll burn through and melt the splines. I've got about 10 levers welded, 1 got messed up on the splines and I'll have to fix it. It takes me about 10 minutes to get each lever in a jig, everything straightened, tacked, removed from the jig, then fully welded. I still need to do the hangers too, glass blast everything, then powder coat everything. It might take me a week or two to finish this first batch of levers, but I promise I'm working on them in all of my limited free time.
For those of you who haven't ordered yet and still want to get a lever, wait until I finish this first batch. I'll let everyone know when I start getting cores back from the first rounders and how many, that way I don't end up with more cores than I have lever blanks. I have 49 lever blanks, so I'll be making 49 levers maximum. When I get the first batch finished, we shouldn't need anyone else to order cores, so I'll let everyone know when they can order round 2.