Finally got the time to get this started again.
Pulling the back end of the bike off was a lot easier the second time round. Just a case of lifting the seat, removing the side pods, taking 4 bolts out and undoing a couple of light connectors.
Then all I had to do was undo the clamps holding the cans on and then lift up the pillion handhold assembly to get to the exhaust strap bolts and undo those.
Once those were undone I pulled the cans off and set about pulling them apart again exactly as before.
It was then onto cutting them down. I decided to cut 110mm off each can (4 and a smidge inches) I was going to Dremel them down but it barely managed to tickle the can so out came the hacksaw and that was worse so a quick couple of calls later I was headed down to a metalwork business to get them cut down on a giant metal saw. Cost for that was £10 ( $15 dollars and change)
So now I have a pair of cut down cans waiting fitting.
I quickly jammed and end can on and stuck it on the bike. Gone from this:
To this:
That's the left can on the right side which is why it's upside down. Was hoping to have enough time to get both on for a sound check but didn't
Ah well. Roll on tomorrow
