Well, time for an update.
I have finished stripping the bike.
I removed the subframe earlier in the week, and have been slowly undoing and removing the wiring/cables at night.
Today I removed the swing arm, the front end and controls.
I have just finished pulling the frame off the engine!
Now to get the frame welded!
I have new foot pegs, clutch/throttle cables, new levers (on the way) and new handle bars.
Hoping to replace brake lines, repair instrument panel (broken mount), replace swing arm bearings etc.
Next few weeks are clean and repair.
Then it's lego time, putting it all back together.
It's been a big job, and I've got a long way to go, but I've enjoyed it so far. :thumbup:
Thanks to this forum for all the great advice/info/tips which have helped plenty so far.
Cheers,
Mac.
:rtfm: :rtfm: :rtfm: