bigdog9191999
High-tech Redneck
well about 50 degrees the other day and i decided to get off my @$$ and get something worth while done. so out to the barn to get some mods done. (one of my many prodjects) (and as a disclaimer i know it needs a bath badly and the pipes are not up where they belong, that will be adressed in a couple days as it did not have a hanger and i am going to make my own.)
i started with the fe i have had lost, bought another, then found. i took my time and went nice and slow as i was in no need to rush.
first got the stocker loose and before i cut wires i had to go back and check to see where the thing was supposed to be mounted. (farther back or up under the bike more, as they did not come with directions) figured which wire went to what to minimize guessing later and guessed a good length and cut it off.. and wow how much bigger it really is.
then it was just taking the time to expose the wires, strip them install shrink tube, butt connectors apply heat and tape up.
got it bolted up and double checked all lights worked and snapped several pics (i still have to get a couple zipties on the wires to hold them up i just didnt have them on hand)
i started with the fe i have had lost, bought another, then found. i took my time and went nice and slow as i was in no need to rush.
first got the stocker loose and before i cut wires i had to go back and check to see where the thing was supposed to be mounted. (farther back or up under the bike more, as they did not come with directions) figured which wire went to what to minimize guessing later and guessed a good length and cut it off.. and wow how much bigger it really is.
then it was just taking the time to expose the wires, strip them install shrink tube, butt connectors apply heat and tape up.
got it bolted up and double checked all lights worked and snapped several pics (i still have to get a couple zipties on the wires to hold them up i just didnt have them on hand)